BaBar Photos

Roll 11 - 4
Overview of the SLAC site
Roll 11 - 10
Inside the PEP-II tunnel
Roll 9 - 1
BaBar detector during assembly
Roll 9 - 2
Drawing of the detector. Much tidier than the real thing!
Roll 18 - 1
Angela O'Neill studying Inflammable drift chamber gas mixtures
Roll 14 - 1
Stew Smith and David MacFarlane pitching in
Roll 13 - 10
Overview of stringing at TRIUMF
Roll 13 - 11
Midway through stringing with the help of the Italian robots
Roll 11 - 11
Popat Patel during QC
Roll 11 - 12
Here I am with the completed chamber
Roll 3 - 1
Stringing is finished!
Roll 13 - 11
Robert Henderson replacing a wire at TRIUMF
Roll 13 - 6
Philip Benoit receiving the chamber at SLAC
Roll 11 - 5
Paul Bloom at the front end of the DCH during installation
ginter-babar-backward
Mike Kelsey working on drift chamber elelctonics before the installation of the support tube
ginter-svt
Full SVT in the clean room
fi18
Blair Ratcliff, the inventor of the DIRC, in front of the completed device
front_view_crack_3
The inner cylinder was cracked and repaired during Summer 2002
Geek conference copy
BaBar collaborators enjoying the Hermitage Resort in Elba, May 2003